Week 3
Resources
Overview
Overview
Session 1
Session 1
Resources Provided for Activity
Each group in the challenge needs:
15 K’NEX Rods of any length from the Real Bridge Building set
15 K’NEX Connectors of any color from the Real Bridge Building set
50g and 100g weights or slotted masses
Ruler
Safety Goggles
Session 2
Session 2
Resources for Simulation 1
Each group in the challenge needs:
A selection of K’NEX Rods and Connectors
Building instructions Booklet
Books or weights (500g-1000g)
Safety goggles
Resources for Simulation 2
Each group in the challenge needs:
K’NEX Real Bridge Building set
Building instructions: Book 2 for the Astoria Bridge
Books or weights (10g-1000g)
Safety goggles
Ruler